Project: CH750-SR   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Skip Rhudy   -  
Project:   Zenair - CH 750   -   VIEW REPORTS
Total Hours:551
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 17, 2019 - No Finish Date
Engine:Corvair
Propeller:Sensenich W642KL-35GS
 
Friendly URL: https://eaabuilderslog.org?s=CH750-SR

Home or Last Project Picture

Apr 05, 2023     Seat Pan Support Area - (2 hours)       Category: Fuselage
Marked (with a rivet spacer fan) and drilled holes in seat pan support panels / support brackets prior to install. Drilled out all holes to final size and then deburred all holes. Drilled extra attach holes in both vertical support channels on the rear fuselage because lower left / lower right holes have AN nuts so close behind the hole that rivet installation is not possible from outside, and inside the channel the rivet gun head will not fit. The extra hole is in middle of bottom row and make up for the missing outside lower rivet.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.